May 15th, 2026
Air Monitoring After Asbestos Removal: Why It Matters for Safety and Compliance
It is a common assumption that once asbestos has been removed, the job is complete. In reality, removal is only […]
Fill in the form below to get a free quote or receive more information regarding our accredited asbestos services.
Circa £200k
Wigan International Swimming Pool
Malrod carried out the entire asbestos removal to Wigan International Swimming Pool.
This involved the entire ceiling area of A.I.B of the main pool. The whole area had to be scaffolded to gain access and provide a suitable working platform over the pool area.
A.I.B removal was also carried out to the changing room ceilings, communal areas and corridors.
Asbestos insulation to pipework and vessels was further carried out within the Plant Room and Boiler Room areas.
Circa £200k
HMS Intrepid
Malrod carried out asbestos removal throughout the former Royal Navy vessel when in dry dock at Liverpool. Asbestos insulation was removed from pipework in numerous locations and from funnel areas and engine rooms.
A.I.B was removed from numerous cabin areas, kitchens, corridors, walls and ceilings throughout the vessel.
The vessel was de-commissioned, dismantled and scrapped following the asbestos removal contract.
May 15th, 2026
It is a common assumption that once asbestos has been removed, the job is complete. In reality, removal is only […]
April 26th, 2026
Birds roosting on commercial buildings are often dismissed as a minor nuisance. However, when left unmanaged, infestations can lead to […]
April 14th, 2026
One of the first questions people ask when asbestos removal is discussed is whether they’ll need to leave the building. […]
April 4th, 2026
Receiving an asbestos survey report can feel overwhelming at first glance. The document is often detailed, with tables, material codes, […]
March 25th, 2026
Asbestos is not always obvious. Many materials used in buildings before 2000 look no different from modern alternatives, which means […]